Sophie Archer's picture

Author: Sophie Archer

Talk to me about MCPD permitting and your Environmental Permit Management System needs. 

Job Title: Environmental Compliance Consultant

Tel: 024 7669 8899

Email: [email protected]

Thursday, 19 August 2021
Grade A Woodchip for a biomass boiler
Sophie Archer's picture
by Sophie Archer

Using waste wood in your biomass boiler

For many, burning recycled waste wood is a great choice, as it is a low cost and readily available biomass fuel. However, it’s important to make sure you’re properly permitted before you even take delivery. There are three grades of waste wood: A, C (which now includes B) and D.
Tuesday, 10 August 2021
11MWth boiler
Sophie Archer's picture
by Sophie Archer

5 MW thermal input systems – let’s get down to permits

The 01 January 2024 deadline for existing 5 MWth combustion plants to be permitted by may seem far away, but, in reality, permits are taking at least 12 months with current Environment Agency (EA) queues. Once the influx of applications starts in 2023, this lead time risks being even longer! Here
Monday, 26 July 2021
Sophie Archer's picture
by Sophie Archer

Permits for RHI Extension and Tariff Guarantee Applications

Have you been approved for an RHI extension? Or maybe you are still waiting for your Tariff Guarantee Stage 2 to be approved? Both have completion deadlines of 31 March 2022, but do you have your permit prepared?
Wednesday, 30 June 2021
MCP Straw
Sophie Archer's picture
by Sophie Archer

Flue testing ports: what installers need to know

Are you an installer of combustion plants? Do your products range over 1MWth input? You may not be aware, but new Medium Combustion Plants (MCPs) require EA Monitoring Certification Scheme (MCERT) accredited ports to be installed for emission testing under Environmental Permit Regulations (EPR).
Tuesday, 29 June 2021
Sophie Archer's picture
by Sophie Archer

Closure of Regulatory Position Statements to new combustion plant permit applicants

Back in December 2020, we updated you regarding the Environment Agency’s new Regulatory Position Statement (RPS): RPS 243 and RPS 244. These were available to new Medium Combustion Plant (MCP) or Specified Generator (SG) bespoke environmental permit applicants from 02 October 2020 to 30 June 2021.
Tuesday, 25 May 2021
Green gas support scheme
Sophie Archer's picture
by Sophie Archer

Regulator site audits – are you compliant?

Do you have an RHI, FiT, or ROC accreditation? Are you a recognised supplier of biomass fuels on the Biomass Suppliers List (BSL) or the Sustainable Fuel Register (SFR)? Or do you operate an Anaerobic Digester that provides biomethane or exports electricity to the national grids?
Thursday, 20 May 2021
Sophie Archer's picture
by Sophie Archer

Permit Tips for Combustion Plant Installers

Does your company distribute and install industrial combustion boilers and engines? Are they over 1 MWth input? You may not be aware that new plants of this size and over need to comply with the Medium Combustion Plant Directive (MCPD) through the Environment Agency (EA), even if you are replacing
Thursday, 13 May 2021
Sophie Archer's picture
by Sophie Archer

Are you compliance ready?

Combustion plants over 1 MWth input and up to 50MWth input need to comply with the Medium Combustion Plant Directive (MCPD) through the Environment Agency (EA). The EA regulate the operation of combustion plants and monitor plant emissions to prevent environmental impacts on the local area.
Tuesday, 13 April 2021
MCP Straw
Sophie Archer's picture
by Sophie Archer

New for old

Replaced or refurbed your boiler since December 2018? Find out if you require a permit to operate.
Tuesday, 06 April 2021
Sophie Archer's picture
by Sophie Archer

Environmental compliance requirements for RHI

Did you submit an RHI application for a new boiler by the 31 March 2021 deadline? Was it over 1 MWth input and operating on biomass? Or maybe under 1MWth but operating on waste wood? If you did not know already, you may require an environmental permit for both the operation of the boiler and RHI

Pages